Loading…
Loading…
MONTSAME

Ulaanbaatar, June 19, 2026 /MONTSAME/. At the initiative of President Khurelsukh Ukhnaa, a large-scale environmental cleanup campaign will be organized along the protected water basin zones of Khuvsgul Lake and the Eg River from June 22 to August 13.
The announcement was made on June 18 by Advisor of President on Environment and Green Development Sandagsuren J., Presidential Press Secretary and Head of the Presidential Media Department Ganzorig Ts., Deputy Chief of the Office of the President Zolboo E., and Head of the Water Agency Batbayar Z.
Khuvsgul Lake contains approximately 75 percent of Mongolia’s freshwater resources and 0.4 percent of the world’s freshwater reserves. Its basin holds an amount of freshwater equivalent to the combined ten-year flow of all rivers in Mongolia. The area surrounding the lake is home to 25 percent of the country’s forests and taiga ecosystems, as well as a significant share of its rare and endangered flora and fauna.
On February 23, 2026, President Khurelsukh issued a decree granting Khuvsgul Lake the status of a state-worshipped lake. The decree calls for comprehensive measures to preserve the lake’s pristine condition and natural ecosystem.
As part of this effort, a working group has been established under the leadership of Deputy Chief of the Office of President Zolboo to coordinate the cleanup campaign through unified management, professional guidance, and intersectoral cooperation. The initiative aims to prevent environmental degradation within the protected zones of Khuvsgul Lake and the Eg River basin.
Speaking at the briefing, Deputy Chief of the Office of the President Zolboo emphasized that the decision to designate Khuvsgul Lake as a state-worshipped site goes beyond ceremonial significance and represents an integral part of Mongolia’s broader environmental protection policy. More than 1,000 participants—including representatives of government agencies, non-governmental organizations, over 100 businesses operating around Khuvsgul Lake, and local citizens—are expected to take part in the campaign.
The cleanup will cover 5,672 hectares along more than 800 kilometers of shoreline and protected water basin areas, including 545 kilometers around Khuvsgul Lake and 303 kilometers along the specially protected zone of the Eg River basin. Organizers stressed that public participation and community initiative are essential to the success of the two-month campaign and called on citizens to join the effort.
Advisor to President Sandagsuren noted that under the President’s leadership, a number of projects are underway to protect Mongolia’s rivers and lakes, including restoration and cleanup initiatives at Ganga Lake, Ugii Lake, Bumbat Spring, the Kherlen River, and Kheltgii Tsagaan Lake.
“Following restoration efforts, the water level of Ganga Lake has returned to the level last recorded in 2004–2005. At Ugii Lake, scientific studies and the construction of protective fencing are underway. These projects are not one-time campaigns but long-term conservation initiatives aimed at ensuring sustainable protection,” he said.
Head of the Water Agency Batbayar highlighted that Khuvsgul Lake is among the world’s 17 purest freshwater lakes. He noted that previous efforts to remove submerged vehicles from the lake had been successful and that the current focus is on cleaning waste along the shoreline and within the protected water basin areas.
“This is a crucial step in safeguarding the exceptionally pure freshwater resources of Khuvsgul Lake, one of the world’s rare natural treasures,” he said, adding that protecting Mongolia’s rivers and lakes contributes significantly to maintaining regional ecological balance.
The government has been implementing a phased program to protect the Khuvsgul Lake ecosystem. In February 2022, a National Forum on Khuvsgul Lake Protection was convened to discuss measures for ecosystem conservation, pollution reduction, environmental restoration, and the development of sustainable tourism.
Following the forum’s recommendations, a permanent working group was established to oversee implementation. The group is currently carrying out 26 measures across four key areas.
Between 2021 and 2024, authorities conducted phased operations to remove submerged vehicles and machinery from depths ranging between 33 and 171 meters in Khuvsgul Lake. A total of 11 vehicles and pieces of equipment were recovered, preventing an estimated 50 tonnes of fuel, lubricants, and hazardous waste from contaminating the lake, according to the Office of the President.


